Jump to main content

Special Rept 95-02:on 951207,valid failure of 1A EDG identified approx 23 & 1/2 h into 24 h endurance surveillance test.Caused by lubricating oil leak at threaded piping nipple.Threaded nipple replaced. Special Rept 95-02:on 951207,valid failure of 1A EDG identified approx 23 & 1/2 h into 24 h endurance surveillance test.Caused by lubricating oil leak at threaded piping nipple.Threaded nipple replaced.

Meta Data

Data source

Japan Atomic Energy Agency's Library Catalog

A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.

December 31, 2020