Jump to main content

Special rept:on 950727,control room operators received 4160 volt ground alarm & main feed pump motor breaker tripped resulting in steam flow/feed flow mismatch alarms on all four SGs. Special rept:on 950727,control room operators received 4160 volt ground alarm & main feed pump motor breaker tripped resulting in steam flow/feed flow mismatch alarms on all four SGs.

Meta Data

Data source

Japan Atomic Energy Agency's Library Catalog

A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.

December 31, 2020