Special rept:on 950727,control room operators received 4160 volt ground alarm & main feed pump motor breaker tripped resulting in steam flow/feed flow mismatch alarms on all four SGs. Special rept:on 950727,control room operators received 4160 volt ground alarm & main feed pump motor breaker tripped resulting in steam flow/feed flow mismatch alarms on all four SGs.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020