Insp repts 50-338/96-01 & 50-339/96-01 on 960114-0224. Violations noted.Major areas inspected:plant operations which included plant status,refueling purification sys walkdown & refueling outage plant operations. Insp repts 50-338/96-01 & 50-339/96-01 on 960114-0224. Violations noted.Major areas inspected:plant operations which included plant status,refueling purification sys walkdown & refueling outage plant operations.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020