LER 95-011-01:on 950914,MSSVs on SG lifted high.Caused by sticking phenomenon between MSSV nozzle & disc seats.All MSSVs retested,adjusted as required & left within TS required tolerance. LER 95-011-01:on 950914,MSSVs on SG lifted high.Caused by sticking phenomenon between MSSV nozzle & disc seats.All MSSVs retested,adjusted as required & left within TS required tolerance.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020