Jump to main content

LER 96-001-01:on 960304,voltage signal actuation loss due to inadvertent relay trip.Enhanced turbine startup sequence by slowing (from 2.5 seconds to 8 seconds) operation of trip/ throttle valve. LER 96-001-01:on 960304,voltage signal actuation loss due to inadvertent relay trip.Enhanced turbine startup sequence by slowing (from 2.5 seconds to 8 seconds) operation of trip/ throttle valve.

Meta Data

Data source

Japan Atomic Energy Agency's Library Catalog

A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.

December 31, 2020