LER 96-001-01:on 960304,voltage signal actuation loss due to inadvertent relay trip.Enhanced turbine startup sequence by slowing (from 2.5 seconds to 8 seconds) operation of trip/ throttle valve. LER 96-001-01:on 960304,voltage signal actuation loss due to inadvertent relay trip.Enhanced turbine startup sequence by slowing (from 2.5 seconds to 8 seconds) operation of trip/ throttle valve.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020