PNO-III-96-038:on 960620,plant shutdown due to potential generic 4,160 volt breaker failure mechanism.Caused by hardening of grease in "trip latch roller bearing." Region III engineering specialist dispatched to site. PNO-III-96-038:on 960620,plant shutdown due to potential generic 4,160 volt breaker failure mechanism.Caused by hardening of grease in "trip latch roller bearing." Region III engineering specialist dispatched to site.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020