Forwards Rev 1 to LER 95-001 re ESFAS outside design basis due to HELB interaction w/SSPS circuits.Rev provides results of integrated problem response team assigned to investigate cause of event & provide C/A to prevent recurrence. Forwards Rev 1 to LER 95-001 re ESFAS outside design basis due to HELB interaction w/SSPS circuits.Rev provides results of integrated problem response team assigned to investigate cause of event & provide C/A to prevent recurrence.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020