Requests NRC approval of change to design bases for SONGS Units 2 & 3 EDGs.Change affects min EDG terminal voltage (75% nominal) which SCE currently committed to maintain at all times during loading sequencing. Requests NRC approval of change to design bases for SONGS Units 2 & 3 EDGs.Change affects min EDG terminal voltage (75% nominal) which SCE currently committed to maintain at all times during loading sequencing.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020