Forwards safety evaluation re proposed change to Tech Spec 4.8.1.1.2d,extending frequency of emergency diesel generator insp requirement from 18 to 24 months.SALP input also encl. Forwards safety evaluation re proposed change to Tech Spec 4.8.1.1.2d,extending frequency of emergency diesel generator insp requirement from 18 to 24 months.SALP input also encl.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020