Forwards response to violations noted in Insp Repts 50-321/96-10 & 50-366/96-10.Corrective actions:valve positions not being checked every 31 days as required by Unit 1 & 2 Tech Specs checked & found in correct position. Forwards response to violations noted in Insp Repts 50-321/96-10 & 50-366/96-10.Corrective actions:valve positions not being checked every 31 days as required by Unit 1 & 2 Tech Specs checked & found in correct position.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020