Amends 109,101 & 81 to licenses NPF-41,NPF-51 & NPF-74, respectively,changing TSs to change ref method for calculating DCF & upper & lower limits for operating pressurizer pressure to reduce allowed operating band. Amends 109,101 & 81 to licenses NPF-41,NPF-51 & NPF-74, respectively,changing TSs to change ref method for calculating DCF & upper & lower limits for operating pressurizer pressure to reduce allowed operating band.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020