Jump to main content

LER 96-007-00:on 961020,automatic initiation of RPS occurred due to SG FW level control sys failure.SG B FRV manual/ automatic control station was replaced 961021.W/961119 ltr. LER 96-007-00:on 961020,automatic initiation of RPS occurred due to SG FW level control sys failure.SG B FRV manual/ automatic control station was replaced 961021.W/961119 ltr.

Meta Data

Data source

Japan Atomic Energy Agency's Library Catalog

A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.

December 31, 2020