Jump to main content

Advises that written summary will be submitted to NRC re GL 96-05, "Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves," within 180 days. Advises that written summary will be submitted to NRC re GL 96-05, "Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves," within 180 days.

Meta Data

Data source

Japan Atomic Energy Agency's Library Catalog

A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.

December 31, 2020