LER 96-059-00:on 961115,reactor pressure vessel high level trip sys single failure vulnerability identified.Caused by failure to identify & properly evaluate all single failure & separation issues.RFP will be reevaluated.W/961216 ltr. LER 96-059-00:on 961115,reactor pressure vessel high level trip sys single failure vulnerability identified.Caused by failure to identify & properly evaluate all single failure & separation issues.RFP will be reevaluated.W/961216 ltr.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020