Jump to main content

LER 96-015-01:on 961019,determined suppression chamber water level operating range of -27 to -31 inches required by TS 3.6.2.1 was not equivalent to water vols.Caused by inadequate calculations.Controls established.W/961211 ltr. LER 96-015-01:on 961019,determined suppression chamber water level operating range of -27 to -31 inches required by TS 3.6.2.1 was not equivalent to water vols.Caused by inadequate calculations.Controls established.W/961211 ltr.

Meta Data

Data source

Japan Atomic Energy Agency's Library Catalog

A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.

December 31, 2020