Jump to main content

LER 96-017-00:on 961102,div 3 DG failed to energize emergency bus within required time limit.Caused by personnel misinterpretation of setpoint data.Added note to drawing to clearly show setpoint.W/961127 ltr. LER 96-017-00:on 961102,div 3 DG failed to energize emergency bus within required time limit.Caused by personnel misinterpretation of setpoint data.Added note to drawing to clearly show setpoint.W/961127 ltr.

Meta Data

Data source

Japan Atomic Energy Agency's Library Catalog

A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.

December 31, 2020