Discusses event which occurred on 961203 re enriched matl observed between Line 3 Calciner inner tube & outer heat shield.Active engineered interlock on tube rotation failed to minimize accumulation.Revised change control process. Discusses event which occurred on 961203 re enriched matl observed between Line 3 Calciner inner tube & outer heat shield.Active engineered interlock on tube rotation failed to minimize accumulation.Revised change control process.