RO:on 961220,designated valve "E" would not close on signal introduction.Reactor core alteration & low power neutron flux measurement was planned 961227. RO:on 961220,designated valve "E" would not close on signal introduction.Reactor core alteration & low power neutron flux measurement was planned 961227.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020