Proposed tech specs re one-time exemption to requirement for special SG tube insp to be performed during 2P95-1 outage scheduled to begin on 950106. Proposed tech specs re one-time exemption to requirement for special SG tube insp to be performed during 2P95-1 outage scheduled to begin on 950106.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020