Responds to NRC 961114 ltr re violations noted in insp repts 50-315/96-09 & 50-316/96-09.Corrective actions:developed plan to determine link between counting functional failures per unit time & reliability assumptions used in PRA. Responds to NRC 961114 ltr re violations noted in insp repts 50-315/96-09 & 50-316/96-09.Corrective actions:developed plan to determine link between counting functional failures per unit time & reliability assumptions used in PRA.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020