Notice of violation from insp on 961027-1207.Violation noted:procedural requirements not met for listed examples for structural modifications on instrument rack 1-H21-P022 containing reactor pressure switch 1-B32-PS-N018B. Notice of violation from insp on 961027-1207.Violation noted:procedural requirements not met for listed examples for structural modifications on instrument rack 1-H21-P022 containing reactor pressure switch 1-B32-PS-N018B.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020