Jump to main content

LER 96-009-00:on 961217,non-critical trip bypass performed w/only SIAS present.Cause of procedure error under investigation.Surveillance test procedure will be revised prior to cycle 9 refueling outage.W/970115 ltr. LER 96-009-00:on 961217,non-critical trip bypass performed w/only SIAS present.Cause of procedure error under investigation.Surveillance test procedure will be revised prior to cycle 9 refueling outage.W/970115 ltr.

Meta Data

Data source

Japan Atomic Energy Agency's Library Catalog

A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.

December 31, 2020