Responds to violations noted in insp repts 50-424/96-12 & 50-425/96-12.Corrective actions:secured latches on Motor Control Center 2-1805-S3-2BBA & 2-1805-S3-2ABA,inspected all other latches & conducted briefings on insp of latches. Responds to violations noted in insp repts 50-424/96-12 & 50-425/96-12.Corrective actions:secured latches on Motor Control Center 2-1805-S3-2BBA & 2-1805-S3-2ABA,inspected all other latches & conducted briefings on insp of latches.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020