Jump to main content

Amends 157 & 149 to licenses NPF-35 & NPF-52,respectively, revising TS Section 4.7.13.1.c to eliminate requirements that 18-month Standby Shutdown Sys DG insp be performed only during shutdown of both reactors. Amends 157 & 149 to licenses NPF-35 & NPF-52,respectively, revising TS Section 4.7.13.1.c to eliminate requirements that 18-month Standby Shutdown Sys DG insp be performed only during shutdown of both reactors.

Meta Data

Data source

Japan Atomic Energy Agency's Library Catalog

A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.

December 31, 2020