LER 94-004-01:on 940209,ESS pump cooling failed. Caused by failure to recognize that ESS pumps dependent on seal & bearing cooling.Revised plant operating procedures so normal position for CV-0913 & CV-0950 open.W/941228 ltr. LER 94-004-01:on 940209,ESS pump cooling failed. Caused by failure to recognize that ESS pumps dependent on seal & bearing cooling.Revised plant operating procedures so normal position for CV-0913 & CV-0950 open.W/941228 ltr.