Responds to NRC ltr re violations noted in insp rept 50-255/97-05.Corrective actions:both leaking piping plugs (one plug per valve) were permanently repaired by installed new forged steel one inch pipe plugs. Responds to NRC ltr re violations noted in insp rept 50-255/97-05.Corrective actions:both leaking piping plugs (one plug per valve) were permanently repaired by installed new forged steel one inch pipe plugs.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020