LER 97-028-00:on 960829,RWST recirculation piping was not in compliance with plant design basis.Caused by lack of questioning attitude while changing frequency of RWST. Valves were closed and tagged shut. LER 97-028-00:on 960829,RWST recirculation piping was not in compliance with plant design basis.Caused by lack of questioning attitude while changing frequency of RWST. Valves were closed and tagged shut.