LER 97-035-00:on 970603,identified that present TS instrumentation setpoint for SG water level low-low may be non-conservative.Caused by process measurement accuracy term uncertainties.Plant currently in extended shutdown. LER 97-035-00:on 970603,identified that present TS instrumentation setpoint for SG water level low-low may be non-conservative.Caused by process measurement accuracy term uncertainties.Plant currently in extended shutdown.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020