Jump to main content

LER 94-019-00:on 940411,determined that feedwater flow transmitters had been improperly calibrated since installation in 1980.Caused by personnel error.Power reduced by 20 MW (th) & recalibrated.W/950112 ltr. LER 94-019-00:on 940411,determined that feedwater flow transmitters had been improperly calibrated since installation in 1980.Caused by personnel error.Power reduced by 20 MW (th) & recalibrated.W/950112 ltr.

Meta Data

Data source

Japan Atomic Energy Agency's Library Catalog

A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.

December 31, 2020