Proposed tech specs revising Surveillance Specification for once through steam generator inservice insp for TMI-1 Cycle 12 Refueling (12R) exams applicable to TMI-1 Cycle 12 operation. Proposed tech specs revising Surveillance Specification for once through steam generator inservice insp for TMI-1 Cycle 12 Refueling (12R) exams applicable to TMI-1 Cycle 12 operation.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020