Jump to main content

Proposed tech spec 4.4.D.1,which changes interval for performance RHR sys leakage test from once every 12 months to perform test during each refueling shutdown. Proposed tech spec 4.4.D.1,which changes interval for performance RHR sys leakage test from once every 12 months to perform test during each refueling shutdown.

Meta Data

Data source

Japan Atomic Energy Agency's Library Catalog

A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.

December 31, 2020