LER 94-004-00:on 941220,discovered that CWS snubber was not tested as required.Caused by oversight by project engineer. Removed snubber for further testing & installed replacement snubber.W/950118 ltr. LER 94-004-00:on 941220,discovered that CWS snubber was not tested as required.Caused by oversight by project engineer. Removed snubber for further testing & installed replacement snubber.W/950118 ltr.