LER 97-005-01:on 970314,RHR was outside design basis due to inadequate administrative controls.Issued shift order requiring that inoperable RWST level channel be cut-out within six h of identification of inoperable condition. LER 97-005-01:on 970314,RHR was outside design basis due to inadequate administrative controls.Issued shift order requiring that inoperable RWST level channel be cut-out within six h of identification of inoperable condition.