LER 97-006-01:on 970828,control room HVAC emergency pressurization unit was found to be outside TS limits.Caused by personnel error.Air flow was adjusted to equal or less than 800 cfm. LER 97-006-01:on 970828,control room HVAC emergency pressurization unit was found to be outside TS limits.Caused by personnel error.Air flow was adjusted to equal or less than 800 cfm.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020