Jump to main content

Part 21 rept re five valves that may have defect related to possible crack within forging wall at die flash line.Caused by less than optimal forging temperatures.Newer temperature monitoring devices at forging area heating ovens procured. Part 21 rept re five valves that may have defect related to possible crack within forging wall at die flash line.Caused by less than optimal forging temperatures.Newer temperature monitoring devices at forging area heating ovens procured.

Meta Data

Data source

Japan Atomic Energy Agency's Library Catalog

A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.

December 31, 2020