LER 97-025-00:on 970923,unplanned ESF actuation occurred. Caused by small expected oscillation in SG levels during filling operation.Deadband on SG low level bistables will be changed.W/971023 ltr. LER 97-025-00:on 970923,unplanned ESF actuation occurred. Caused by small expected oscillation in SG levels during filling operation.Deadband on SG low level bistables will be changed.W/971023 ltr.