Proposed tech specs pages,reducing maximum test interval from one yr to six months for test frequency of main turbine stop & control valves in Table 4.1-3 & adding footnote. Proposed tech specs pages,reducing maximum test interval from one yr to six months for test frequency of main turbine stop & control valves in Table 4.1-3 & adding footnote.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020