LER 97-002-00:on 971012,inadvertent isolation of svc water cooling to 2B DG during sys alignment,occurred.Caused by shift mgt not ensuring all operability requirements met. Valve 2MOV-SW0023 opened to restore flow to 2B EDG. LER 97-002-00:on 971012,inadvertent isolation of svc water cooling to 2B DG during sys alignment,occurred.Caused by shift mgt not ensuring all operability requirements met. Valve 2MOV-SW0023 opened to restore flow to 2B EDG.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020