Proposed tech specs changing SG insp schedule to require next insp within 24 months of Mode 2 for Unit 2 fuel cycle 10. Proposed tech specs changing SG insp schedule to require next insp within 24 months of Mode 2 for Unit 2 fuel cycle 10.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020