LER 97-008-00:on 971027,both EDGs inoperable during testing. Caused by TS surveillance requirement to demonstrate operability of remaining EDG when one inoperable.Required TS actions cleared following 1J EDG testing.W/971104 ltr. LER 97-008-00:on 971027,both EDGs inoperable during testing. Caused by TS surveillance requirement to demonstrate operability of remaining EDG when one inoperable.Required TS actions cleared following 1J EDG testing.W/971104 ltr.