Responds to violations noted in insp rept 50-395/97-11. Corrective actions:decided to enter TS 3.0.3 & reduced power while calibr performed to return OT delta T & OP delta T lead-lag time constant settings within TS values. Responds to violations noted in insp rept 50-395/97-11. Corrective actions:decided to enter TS 3.0.3 & reduced power while calibr performed to return OT delta T & OP delta T lead-lag time constant settings within TS values.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020