Forwards MOR for CPSES for Oct 1997.Unit 2 power relief valves opened after unit was cooled down to LTOP arming temperature (350 degrees) w/pressure above LTOP setpoint. Forwards MOR for CPSES for Oct 1997.Unit 2 power relief valves opened after unit was cooled down to LTOP arming temperature (350 degrees) w/pressure above LTOP setpoint.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020