LER 97-008-06:on 971010,determined that projected SG leak- rate combined w/TS limit for dose equivalent Iodine creates potential for operation outside design basis.Caused by density correction.SGs replaced.W/971107 ltr. LER 97-008-06:on 971010,determined that projected SG leak- rate combined w/TS limit for dose equivalent Iodine creates potential for operation outside design basis.Caused by density correction.SGs replaced.W/971107 ltr.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020