LER 97-013-00:on 971020,determined that reactor bldg ventilation ductwork may not meet seismic design basis. Caused by conflict within design basis.Completed seismic verification walkdowns.W/971119 ltr. LER 97-013-00:on 971020,determined that reactor bldg ventilation ductwork may not meet seismic design basis. Caused by conflict within design basis.Completed seismic verification walkdowns.W/971119 ltr.