Part 21 Rept 94-001 re seismic qualification for diesel fuel oil day tank,transfer pump control switch & foot valve.Shake test w/item installed in fluid filled tube recommended for porcelain displacer of switch. Part 21 Rept 94-001 re seismic qualification for diesel fuel oil day tank,transfer pump control switch & foot valve.Shake test w/item installed in fluid filled tube recommended for porcelain displacer of switch.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020