LER 97-023-00:on 971229,discovered that 1B EDG wired in configuration,may have continued to operate,if fire had occurred in zones 11.5-0 or 11.6-0.Caused by error on part of technician installing.Technician counselled.W/980128 ltr. LER 97-023-00:on 971229,discovered that 1B EDG wired in configuration,may have continued to operate,if fire had occurred in zones 11.5-0 or 11.6-0.Caused by error on part of technician installing.Technician counselled.W/980128 ltr.