Jump to main content

Part 21 rept re spring return binding in GE type SBM control switches at Dresden,LaSalle & Quad Cities.Caused by failure to account for Post-Mold Cure shrinkage in design tolerance.Established operability determinations. Part 21 rept re spring return binding in GE type SBM control switches at Dresden,LaSalle & Quad Cities.Caused by failure to account for Post-Mold Cure shrinkage in design tolerance.Established operability determinations.

Meta Data

Data source

Japan Atomic Energy Agency's Library Catalog

A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.

December 31, 2020