LER 98-001-00:on 980122,determined that RCS was outside design basis for inadvertent ECCS actuation at power.Caused by personnel error.Operability assessment performed, evaluated inadvertent ECCS actuation. LER 98-001-00:on 980122,determined that RCS was outside design basis for inadvertent ECCS actuation at power.Caused by personnel error.Operability assessment performed, evaluated inadvertent ECCS actuation.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020