LER 97-005-01:on 970221,supplement to unapproved mode change w/TS required equipment inoperable were noted.Caused by inadequate planning & briefing.Both units have been placed in cold shutdown w/RCS at atmospheric pressure. LER 97-005-01:on 970221,supplement to unapproved mode change w/TS required equipment inoperable were noted.Caused by inadequate planning & briefing.Both units have been placed in cold shutdown w/RCS at atmospheric pressure.