LER 98-002-01:on 980108,discovered several broken master relay (MR) covers inside SSPS logic cabinet.Caused by past practice of removing MR covers to perform time response testing.Replaced all unnacceptable SSPS MRs.W/980225 ltr. LER 98-002-01:on 980108,discovered several broken master relay (MR) covers inside SSPS logic cabinet.Caused by past practice of removing MR covers to perform time response testing.Replaced all unnacceptable SSPS MRs.W/980225 ltr.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020